Using SMED and Lean Tools to Improve Turnaround in Oil & Gas
Turnaround (TAR) in the oil and gas industry
Turnaround (TAR) in the oil and gas industry is one of the most resource-intensive and complex operations, requiring meticulous planning, coordination, and execution. Delays and inefficiencies in turnarounds can lead to significant financial losses due to extended downtime. To optimize turnaround execution, oil and gas companies can leverage Lean manufacturing principles, specifically Single-Minute Exchange of Die (SMED) and other Lean tools, to minimize delays, streamline processes, and maximize efficiency.
SMED (Single-Minute Exchange of Die)
SMED (Single-Minute Exchange of Die) is a Lean methodology focused on reducing changeover time. Originally designed for manufacturing, it can be adapted for oil and gas turnarounds by minimizing equipment downtime during maintenance, inspections, and component replacements.
Steps to Implement SMED in Turnarounds
- Identify Internal and External Tasks
- Internal tasks: Activities that must be performed while equipment is offline.
- External tasks: Activities that can be completed while equipment is still in operation.
- Example: Pre-assembling maintenance tools and kits before shutting down equipment reduces idle time.
- Convert Internal Tasks into External Tasks
- Perform pre-inspections and pre-staging of materials before shutdown.
- Train personnel in advance to avoid delays in execution.
- Example: Conducting pre-shutdown valve testing rather than waiting for the official shutdown.
- Streamline and Optimize Internal Tasks
- Use quick-change mechanisms for removing and installing components.
- Employ standardized work procedures to avoid confusion and inefficiencies.
- Example: Implementing pre-fabricated piping sections to speed up replacements.
- Standardize Changeover Procedures
- Document and refine best practices from previous turnarounds.
- Develop checklists and standard operating procedures (SOPs) to ensure consistency.
- Example: Using Lean visual management techniques such as color-coded tags for work prioritization.
Additional Lean Tools to Enhance Turnaround Efficiency
- 5S (Sort, Set in Order, Shine, Standardize, Sustain)
- Organize tools, equipment, and materials to minimize searching and retrieval time.
- Keep work areas clean and free from unnecessary items to enhance safety and efficiency.
- Visual Management
- Use charts, dashboards, and visual cues to enhance situational awareness and efficiency.
- Apply color-coded tags, floor markings, and signage to streamline movement and organization.
- Example: Deploying digital boards to display real-time turnaround progress and highlight priority tasks.
- Kaizen (Continuous Improvement)
- Encourage teams to review and suggest improvements for future turnarounds.
- Conduct post-turnaround reviews to identify bottlenecks and enhance processes.
- Value Stream Mapping (VSM)
- Map out the entire turnaround process to identify non-value-adding activities.
- Focus on eliminating waste such as waiting time, unnecessary movements, and overprocessing.
- Kanban (Visual Workflow Management)
- Use visual boards to track progress and avoid bottlenecks.
- Ensure real-time monitoring of materials, personnel, and task completion.
- Total Productive Maintenance (TPM)
- TPM focuses on maximizing equipment reliability through proactive maintenance practices.
- Involve operators in routine maintenance to prevent unexpected failures.
- Use predictive maintenance tools to schedule interventions before breakdowns occur.
- Example: Implementing condition-based monitoring systems to detect early signs of equipment deterioration and schedule repairs in advance.
- Standard Work
- Define the best-known method for performing a task to ensure consistency and efficiency.
- Train workers on standardized procedures to reduce variation and errors.
- Continuously improve and update standard work based on feedback and lessons learned.
- Example: Establishing detailed turnaround execution procedures to ensure every maintenance step follows a proven, optimized workflow.
- Theory of Constraints (TOC)
- TOC focuses on identifying and addressing the most significant constraints (bottlenecks) in a process to improve overall efficiency.
- Utilize TOC principles to optimize scheduling, resource allocation, and workflow management.
- Example: Identifying a critical path activity (e.g., heat exchanger cleaning) and ensuring all dependent tasks are optimized to avoid delays.
Benefits of Using SMED and Lean Tools in Turnarounds
- Reduced Downtime: Faster execution leads to quicker restart of operations.
- Cost Savings: Minimized labor costs and more efficient resource utilization.
- Improved Safety: A structured approach enhances compliance and reduces risks.
- Higher Equipment Reliability: Standardized procedures ensure better maintenance quality.
- Greater Flexibility: The ability to adapt quickly to changes in scope or unexpected issues.
Conclusion
By integrating SMED and Lean tools into turnaround strategies, oil and gas companies can significantly reduce downtime, improve resource efficiency, and enhance overall operational performance. Successful implementation requires commitment to continuous improvement, employee training, and proactive planning. With a Lean-focused approach, companies can transform turnarounds from costly disruptions into well-orchestrated, value-driven processes.
Contact Us
Contact us now and our friendly customer service consultants will be in touch with you to design the best Lean Six Sigma, Lean or Six Sigma training/consulting solution that is tailored to your requirements.